Image from the Biodiversity Heritage Library.
Contributed by American Museum of Natural History Library.
| www.biodiversitylibrary.org
Transcription
N.Y. to Boston.
5
Friday July 4 - 1913.
Clear & pleasant with light air SE by Y. Ideal weather
continued steaming through inside route passing
out through Collock Rip about 8 a.m. Shortly
air along the Cape and towards Boston in the Bay.
Passed up Boston Pilot about 4m p.m. and
continued on up the Bay.
We were met by several of Mac's friends in
different boats and the harbor craft sailed in
most cases.
By 61/2 o'clock we were tied up to the United
Fruit Company's dock at the foot of State Street.
All of the Expedition went ashore to visit
friends.
Saturday July 5.
Boiling hot day. Ship so crowded that we had
quite difficulty in loading our 14,000 lbs. of dry
goods and many miscellaneous ship's material etc.
MacMillan was photographed in every conceivable pose
while demonstrating his equipment of sledges,
spring yards etc.
We expected to sail at 7 o'clock but this was not
work steam until 43/4. We steamed down with our
friends and one engineer, the rest of the crew having
tea ashore. We anchored in the Lower Harbor of The Cape
went back after the men bringing them up at midnight.