Image from the Biodiversity Heritage Library.
Contributed by Smithsonian Institution Archives.
| www.biodiversitylibrary.org
Transcription
Gould, P. J.
1963--At Sea
15
August 3, 1963--2[illegible] days out from Pearl Harbor (S & W) in YAG 39. Ca. 500
nautical miles by evening.
Hawaii
Johnston
Island
200 mi.
250 mi.
Above is proposed grid coverage pattern for this phase of the Pacific project.
The YAG 39 will make between 9 and 11 knots until the grid is reached.
There a steady (as much as possible) 8.4 knots will be held while on the
grid. It is hoped that we can maintain an average of 8.4 knots so that on
the first leg of the grid we will spend daylight at the Johnston Island
half and night at the far end, then in the next leg to have night at the
Johnston Island part. This first trip we plan to do a lot of collecting so
this schedule may be hard to keep.
0641--Wedge-tailed Shearwater starboard to port
0643-- " " " port
0649--Sooty Tern 1 ad and 1 juv on port, 20-25' above H2O
0720--Sooty Terns 50 plus/minus offport bow
0720--1 large bird (Frigate?) in with above terns
0728--Wedge-tailed Shearwater (2) starboard
0735-- " " " (1) starboard
0745-- " " " (1) port