Image from the Biodiversity Heritage Library.
Contributed by American Museum of Natural History Library.
| www.biodiversitylibrary.org
Transcription
we will bring across the heavier pieces due
on the boat the 21st of the month.
May 10 Hollandia New Guinea
There is still a bit of work to do
down about the godowns, cement the floor of one, painted floor
of other. Build and fit the doors, build shelves, etc.
Bryce and Mildred are busy at the new residence.
The former is putting in joists and beams, the
latter building a kitchen.
Some number of Coolies reported for work
today (1/12) 61 Locals and 51 Sentinels.
The jungle crew worked at ranging timber and
timber for the float. Up to date there is
a total of about 425 meters of ranged timber.
There is 40 meters more than an area so placed
rungs. Tomorrow will be the last day at range
timbers. The excess is in case then or some timbers
while proving unworkable.
Today a little from Mr. Elbi saying he
was out of gasoline for his Ford engine that
runs the saw mill. Tomorrow we send him
some local gasoline as well as 3 drums of our
aviation gas.
Mr. Reese, a German settler, called today
bringing fruits, vegetables, and food for our
consumption ($7.50). Included 2 large bundles of
tomatoes (55), vegetables of 3 varieties, 4 chickens, eggs.
He has offered to send us fresh fruits and vegetables
twice or three times a week. Fresh food is always
welcome in our garden although eggs to lay up
love for the most part need only fresh
food stuffs.
May 11 Hollandia New Guinea
The work goes on. A door is being made for the
godown, cementing a floor, rebuilding at the new yardens,
remodeling our residence, and building the radio shack.
We have accomplished a great deal since an arrival