Image from the Biodiversity Heritage Library.
Contributed by Yale Peabody Museum of Natural History.
| www.biodiversitylibrary.org
Transcription
On 5/12/95, 4 1/2 miles of Cannon Falls from
S. end of town at junction with
(1)
West side of U.S. 52 / S. bound lanes
Photograph. Hammer head on Unit no. [illegible]. Break in slope to shale
at top of Unit 7. C.S#1. B+W#1. Sherwood Mb.
Up higher in section C.S#2. B+W#2
Top of Sherwood Mb. & overlying Wall Mb
of Prosser Fm.
Mile Post 93 close to top of section
B+W#3 just a few paces N. of M.P. 93
Cyclicity is about 1' to 2 1/2' through most of section
argill. limestone with very silty-shaly breaks - not
sequence boundaries as such, but there is a change
in amount of argillaceous material entering the
depositional system, sporadically upwards.
St. Paul Mapp [illegible] 1:250,000 pencilled location
Hoverson & Gerbi's Wagner Hill section
in R. Sloan, ed., 1987. Minn. Geol. Survey
Rept. of Invest. 35, fig. 9-3