Image from the Biodiversity Heritage Library.
Contributed by Museum of Vertebrate Zoology, University of California, Berkeley.
| www.biodiversitylibrary.org
Transcription
Code
1958
General Account
18 August - cont-
part of T2, and along the first half of T3.
Activity is difficult to determine on the
hard rocky areas covered by TS 6.
August, Jugo Lake
In the morning I set out traps on T3,
walked up to the little lake ca 3/4 mi
above Jugo, cut into the flats a mile
above camp and back along the river.
Also set out the mist-net in the same
brushy area as last year - just below the
little lake along the stream bed leading
out of it down hill.
In the afternoon I shinned some specimens
and walked around Jugo Lake.
August Jugo Lake
After running the trap lines and checking
the mist-net, I walked up the river following
the flood plain to the first large creek
couting out of bed rock on the left limit
about 2 1/2 miles above camp. Walked up
this creek spending an hour or so in
the willow brush area ca 1500 ft by
300 ft in area - some stuff 6 ft tall
but all scattered stands. Then returned
over the high mooraine creek to
camp. Left at 1100 and returned at 1545.
Ran trap lines in the evening.