Field Notebook: Arctic 1990b
Page 11
Image from the Biodiversity Heritage Library. Contributed by Yale Peabody Museum of Natural History. | www.biodiversitylibrary.org
Transcription
156 Iron curtain Some initial drafts Plant frog s = build open headland grain size for wash device in the beds Sq. of marked over channels w/ notchings Tough a s. d on h p trough rubble debris Top room of se in beds to enlarged feet, then drain current sheet. Good soil formed as in s. organic soil accum. 80cm E SSS SS Roots, orchid Trough supplied One apple top unit = NW-SE NW SE