Image from the Biodiversity Heritage Library.
Contributed by Yale Peabody Museum of Natural History.
| www.biodiversitylibrary.org
Transcription
134
Unit #201 #194
1.9 +4.2m.
mass. then replace us x b, make
in into in tobramycin.
Plant frogs to top.
Tintedp. and plaster on the sides
beneath.
Poston on top us concrete and
horizontal Subsequently exp. on flies
plants.
Unit #202 #195
16.7m
+ 1.7m above base, 30cm thick coal
Above, blocked, med brgr. filler
murlet 80cm thick
to top red-bleat carb. shale
Unit #203 #196.
2.4m
Base of spur of channel is. Placed
lower strata on them, so
grad. unit murk's with replace to top fine what's.