Field Notebook: 1980
Page 117
Image from the Biodiversity Heritage Library. Contributed by Yale Peabody Museum of Natural History. | www.biodiversitylibrary.org
Transcription
8/8/80 6517 Marl fissile 65.95 Carb paper sh. 67.1 Fr. water is conc 673 Above this covered used Jacob staff at 1.69 m to get to 6s. ledge forming upper rim of valley 67m + 12 units (1 unit = 1.69 m) +0.5m to base of ss vfg massive, non calc. Top of ss @ 1.5 m above 12 Interval above this includes fresh H2O is 120+11 13.1 U to 13.7 U 13.7 to 14 covered interval non calc. 14 x bed ss -to 14+0.5m Top Polecat Bench, Top of section