Year
Unknown
Image from the Biodiversity Heritage Library.
Contributed by American Museum of Natural History Library.
| www.biodiversitylibrary.org
Transcription
24
Yacht "France"
May 21 Light variable wind, overcast and
passing showers. Vessel drifting
with the tide about 3 miles off
Barunga Isl. at 5 P.M.
Started the engine at 6 A.M. after much
trouble in getting it going.
2/55 A.M. Arrived and anchored in
Tulagi harbour. Sent mail away
by "Motaram". Squally with
rain during the night. Vessel dragged
her anchor about 30 yards.
May 22 Light breeze fine clear weather.
Sabbath day observed.
May 23 Calm and light airs Bar 30.04.
Got all ready for departure at
5.30 A.M., but the engine was not
ready and later it refused to start,
sailing abandoned and Mr Beck
landed for collecting, Hicks
fixing the engine.
Mr Beck returned at 2/45 T.m., have up
at 5 proceeded at 2/55 under engine
power through the channel sound
Garauta Isl.
4/55 T.m. Arrived anchored in Port Turris
calm and light rain showers.
May 24 Calm and fine clear weather Bar 30.00
6.30 A.M. Party landed for collecting.
Crew employed painting the boat and
putting off new main ballysides.
All on board by 5 P.M.
Fine during the night.
May 25 Calm and light variable airs
Mr Beck landed for collecting
Crew variously employed. All on board by
6 T.M. Fine during the night
Vessel pumped out during the day as required
25
Yacht "France"
May 26 Anchored in Port Turris, similar to yesterday.
May 27 Calm and variable airs. 8 A.M. Bar 30.01
6.17 A.M. Afloat away, but had to wait till
the engine would start before lifting
the T, the proceeded down channel
7/35 Arrived off Gavutu Isl and stopped,
Mr Beck landed to visit the stores.
8/6 got away, but soon had trouble
with the engine, which finally stopped.
Set all sails and got asternage way
on her to clear between the reefs.
Engine started again after 1/2 hour.
9/35 Arrived and anchored in Tulagi. Took
in 100 gals of fresh water.
Hicks trying to fix the engine.
Very heavy rain all night.
May 28 Light breeze, overcast and passing showers
5/30 Afloat short and waited till
6/35 for the engine to get fixed and
started, then proceeded out, setting
sail as soon as possible.
Mr Beck stopped the engine without
reference to me, while in the channel
between Sylvia & Southern boso Reefs. The vessel
had only the head sails on her at the time and
the fore-sail was being set. We passed
through steering by the wind.
Set course for Guadalcanar and breeze
freshened.
12/35 Arrived and anchored at Domna.
Party landed for collecting. Fresh Easterly
wind and moderately rough sea.
Set go the star T at 3 P.M as the vessel
had dragged a little
5 P.M. All on board again; wind and
sea going down. Fine during the night
Vessel pumped out daily as required, making
a lot of water while at anchor with the bad sea