Year
Unknown
Image from the Biodiversity Heritage Library.
Contributed by American Museum of Natural History Library.
| www.biodiversitylibrary.org
Transcription
132
Motor Schooner France
June 1945
Saturday 13th S & SE fresh breeze and jumpy sea Bar 30.15
I am start to the W.E. Called the Engineer to assist
to work ship but he refused. 8 am Called the three
loafers aft and told them I was going back
to shore to get rid of them and get men.
Engineer Hicks said it was not his fault if men
got sick. He was here to assist Mr Corriza and look
after the Engine 22 Fraser & McGowan promised
to turn to. Petty to run back to leave at 40 feet going
4 PM SSE with same but log pump lights Look out at 3.
Sunday 14th S SE to SE mod breeze Hazy Bar 30.09 8 am
Watched Gal. 13.12 Dist 7nm Pumps light Anchor at 5
Monday 15th SSE to SE with rain Bar 29.99. 9 am Kambaran
B. W & N Dist 4nm Started Engine Noon wind dying
in SE stopped Engine. 5:30 PM Tugboat B NE Dist in
Falling light with same Pump Light & Lookout at 7.
Tuesday 16th Calms + Light variable airs with continual rain
and thick weather. 8 am clearing from SSE Bar 30.05
Noon Lat 19°21' N Long 175°13' W Ship Head E&S (Gale Gal)
B S x 2½ Dist 27 nm. 5 PM Heaving 31x34 Pump
Lights / Anchor attended to.
Wednesday 17th S to SSE fresh Breeze Bar 30.15 Beating up
towards Vaton during The night and anchored
close to boat passage in 12 fms at 9 am. Landed
Mr Corriza and two men Pump lights at 7 Engine run 1 hr
Thursday 18th S & SE fresh Breeze Bar 30.05. Mr Corriza
and 2 men landed at 7 am. Employed rep sails &
getting firewood etc pump Anchor watch light at 8.
Friday 19th SSE to S fresh breeze Bar 30.20 Got a load of
firewood off & Left for One Shaw at 10 am
Noon Lat 19°52' S Ship Head SW. 8 PM Freshening Reefed
M.S & in Outer fit. Midnight Blowing a gale. Took
in Inner fit sheet carrying away & Reefed
Foresail. A wicked sea running but ship
still head reaching Pump lights Lookout at 10.
Left Vaton.
133
Motor Schooner France
June 1925
Thursday 20th Q Hg SSE gale nasty wicked seas
6:34 am Wind increasing in force. Double reefed
Main-sail and Stay-sail furling away
carried Started Engine to keep command of the ship
One Shaw & SSE Dist 12 nm Worked up toward
the Island under double reefed Canvas & Stay-sail
with The engine going. Found it very hard work
but got the anchor down in 11 fms 45 fathoms chain
on edge of Reef at Noon 4 PM Set 40 fathoms
anchor also in 11 Fms Blowing hard. Mr Corriza
Boats Crew returned 5 PM 1½ miles pull against
wind Current To land. Pumps Anchor Lights watch at 7
Sunday 21st SSE gale Bar 30.20. Mr Mrs Corriza with
boats crew ashore all day. Hard job to get these
pump Light revetel attended to.
Monday 22nd Storm ESE gale Bar 30.25. Mr Corriza with two
assistants and a Boats Crew of three for the shore at
9 am leaving a boy and the Cook aboard. Gale increased
in violence and the ship commenced to drag. Paid out
more chain. PM wind hauled North of East in fierce
gusts. Repaired and double reefed M.S & F.S. Boat
and Crew of three returned at 5:45 PM Wind ENE
ship rolling spitting at her anchors. Pump Anchor Watch
Tuesday 23rd Blowing a hard gale from ENE Bar 29.95
Considerable pitch roll + strain at Anchorage. Employed
repairing jib sheets etc Moderating slightly at Sunset.
Pump Anchor-watch and Light attended to.
Wednesday 24th WE gale Bar 30.15. Sail boat ashore for Mr Corriza and
party at 6 am Returns at Noon when commenced to
get under way. Found Cutter full of water and a
big sea and went against us but some difficulty
to clear same. Under way at 1:30 Beating to the
Southward under double reefed Canvas and The engine
going. Ship getting some hard knocks stopped
Engine at 4:30. SH SSE & Pump lights Lookout etc to.
Left One Shaw.