Year
Unknown
Image from the Biodiversity Heritage Library.
Contributed by American Museum of Natural History Library.
| www.biodiversitylibrary.org
Transcription
90
Motor Schooner France
June 1924
Tuesday 3rd Light air - squalls all around The compass
Heavy rain-squall from SW at 2 am. Employed
as yesterday Noon Lat 15°58'S Long 177°15'W
E SV x W 81am Pm calm up to 6 o'clock
Pump Lights Lookout attended to
Engine ran 9 hours.
Wednesday 4th Heavy SW squall with torrent rain
at 5 am 8 am light NE breeze & Fine
Employed Holystoning maindeck etc
Noon Lat 16-11 S Long 178°27' W Co NW 72-
Pm Mod ½ Breeze to SW ½ W
10 Pm Sighted Waitangalanga light
Pump Lights Lookout attended to.
Thursday 5th Strong squalls ½ and ESE am carried
away the Port shroud of the Fore-riqqen in a
squall Finished fixing temporary at 9 am
5 reefed down 11.40 am here light house
NW Co SW Bar 30.18 Remained same
weather right through the day 10 Pm no sail
light B NW Co SW x W.
Pump Lights Lookout attended to
Friday 6th
Saturday 7th 1-30 Am Anchored in Suva harbour
Sunday 8th SE fine Bar 30.03
8 am moored to wharf in Waile Bay
above SS Pioneers berth
Pump and gangway light attended
91
Motor Schooner France
June 1924
Monday 9th S E fine Pm slight showers Bar 30.13
Drying - unbending sails etc Pump Light attended
to.
Tuesday 10th Showery ½ Bar 30.13 Sent down Headstays
and fore riggen etc Pump and light attended to.
Wednesday 11th Showery ½ Bar 30.15 Discharging Ballast
& cleaning hold and Engine Pump Light attended to.
Thursday 12th Showery ½ Bar 30.16 Work as yesterday
Friday 13th Showery ½ Bar 30.19 Working in hold and
on riggen etc Pump Light attended to
Saturday 14th Showery ½ Bar 30.17 Work as yesterday
Sunday 15th ENE Fresh Showery Bar 30.19 Pump Light attended
to.
Monday 16th Showery ½ Bar 30.20 White washing hold
& working on Riggen & Engine Pump Light attended to
Tuesday 17th Showery ½ Bar 30.20 Work as yesterday
Wednesday 18th Showery ½ Bar 30.19 Work as yesterday
Thursday 19th NE Showery Bar 30.20 Put the ship on the
lip and cleaned her bottom.
Friday 20th Showy ½ Bar 30.18 Shore gang working
on ships bottom & Engine Crew cleaning painting
and on Riggen.
Saturday 21st Showery ½ Bar 30.18 Work as yesterday
Sunday 22nd Showery Squally ½ Bar 30.18.
Monday 23rd Heavy rain Bar 30.14 Public Holiday
Crew working in hold.
Tuesday 24th Showery ½ Bar 30.20 Work proceeding as
well as can be expected constantly stopped
by rain all through our time on the slip
Wednesday 25th Strong SE gale Bar 30.22 Heavy rain squalls
Finished work on ship and got off at 4 Pm.
Tripped the engine & moored above Pioneers berth
Thursday 26th Strong SE with heavy rain squalls 83020
Pulling both ballast etc Pump Light attended to.
Friday 27th Rainy ½ Bar 30.18 Working on riggen
& replacing Ballast etc Pump Light attended to.