WALL OF EARTH,
SANDBAGS STOPS
RIVER TORRENT
River Sunday Within Foot of
High Water Mark Reached
in Last Week's Flood
Big Run-Off Pours Down Deer
Creek Following Heavy Rain
Late Saturday Night
The excess water that came
down Tule river Sunday, following
the heavy rains of the night be-
fore, beat in vain at the new dam
that blocked the way down the
channel washed from the river to
Porter slough the week before.
The slough carried only a small
head of water Sunday morning,
while the river, fed by the heavy
rains of the previous night, reach-
ed to within a foot of the mark
made on the night of February 6,
last.
Along the wall of sandbags that
had been placed across the break
between river and slough last
week, river rose to a height of
three feet. If this new channel had
not been damned up, a flood riv-
al ling the previous torrent would
have poured into the slough and
swept through Porterville.
Deer Creek High
Heavy rains Saturday night in the
Deer Creek watershed brought that
stream up to as high a mark as
it reached last week, a foaming tor-
rent pouring under the highway
bridge south of Porterville all day
Sunday. The creek is still carrying
an unusually heavy head of water, as
is Tule river.
Rains Pass Foot Mark
Total precipitation in the storm
that started Saturday afternoon
reached .91 of an inch by this morn-
ing, and the rainfall total for the
season to date is now 12.04 inches,
one of the heaviest winter precipita-
tions in the history of the district,
to the middle of February.
was lifted from its foundation and
moved a short distance where it be-
came anchored against some trees.
While there is quite a bit of damage
there resulting from the two floods,
none of it will cost very much money
to repair.
Olive Flooded Again
A portion of the Olive street ex-
lessen their severity.
Likewise, according to Bonine, con-
struction of overflow basins will be
only a temporary measure because
silt in the streams eventually would
fill up the basins and necessitate con-
struction of new ones.
But overflow basins, he continues
can be used to advantage along the
lower Mississippi in filling up swamp
the place where the cement broke