Image from the Biodiversity Heritage Library.
Contributed by American Museum of Natural History.
| www.biodiversitylibrary.org
Transcription
(150)
sheathing off, the captain and I decided that it was
most advisable to put the ship up now and have
that part of the overhaul put in order before the
engine is installed at which time the ship will
be on the slip for at least two weeks. Some of
the copper has been off since May and three
months is the maximum risk of penetration by
the tereida worm. In view of our having to go up
twice Mr. Fletcher, the slip manager, deducted
$10 from the total cost of pulling the vessel
up (usual charge $30 - once). The "France" was on
the slip from Sept. 24th to Sept. 27th (4 days) - dur-
ing which time over 60 plates of copper were re-
placed and a surprising amount of miscel-
laneous work done. Indeed, she was in sorry
need of repair. On the 26th and 27th, David
and I went out shooting with good results.
David brought in a night hawk and I con-
tributed a beautiful, little bush kingfisher,
a woodpecker, and a peculiar ground run-
ner - almost like the Solomon Is., "long-
tail on a smaller scale. Its stomach showed
insects. I had to stalk it to get a shot;
it never flew, but ran very swiftly in the
thick grass that covers the terrain around
the plantation and dairy farm near the ship.