Image from the Biodiversity Heritage Library.
Contributed by American Museum of Natural History Library.
| www.biodiversitylibrary.org
Transcription
Apr 30 Hollardia, New Guinea.
Today's work - Construction or rather moving of
a narrow gauge railway for transporting small rock
for a hill. Cutting and felling of godown
logs.
Debarking logs.
There were more stringers for the ramp
brought in today (Sentani) 16.4 M, 9.5, 9.6,
11.8; Hollardia 12.0 M, 12.0, 18, and one too
small for gear. Total 80.5 Metres.
There were 96 coolies that reported for work
today 37 Sentani and 51 Hollardia. Twenty three (23)
of the Hollardia coolies helped me about the
godown moving material etc. The rest of the
coolies cut giant logs for the ramp.
May 1 Hollardia New Guinea.
Today being Sunday there was no work done.
The Coolies of Sentani and Hollardia are as
maximized that they refuse to work on Sunday.
It is rather inconvenient for us in that we
would like to crowd our work along.
We were invited to the home of Mr. Bozland
for dinner or rather lunch. It consisted of a
large 'rice stuffel' the national dish of the
Dutch East Indies.
May 2 Hollardia New Guinea.
The work today has been a continuation of building
of the godown; completion of the narrow gauge railway;
felling of the swamp about where the tail of the
airplane is to come and a continuation of the work
collecting giant staves.
There were 112 coolies reported for work today,
56 from Sentani and 56 from Hollardia. One day
this or one reporting for work. We will soon start
wedding out the gold from the bed.
There were four more ramp logs into day
about 10 metres in length. The logmen also
brought in a quantity of small stakes which will
be used for battens on the godown and house.